莱钢3200m^3高炉炉前揭盖机行走机构优化改造

Optimization and Transformation of the Walking Mechanism in Casthouse Cover Manipulator of 3 200 m^3 Blast Furnace in Laigang
下载PDF
导出
摘要 针对3200m^3高炉炉前揭盖机行走机构在运行过程中出现的跑偏、行走轮损坏、导轨起头或脱落、导轨积渣等故障进行了一系列的优化与改造,从而消除设备隐患,保障了炉前揭盖机的稳定运行,提高了铁口区和风口区的操作条件和除尘效果。 Aiming at the faults occurred in the running process of the walking mechanism in casthouse cover manipulator of 3 200 m3 blast furnace, such as running deviation, walking wheel damage, guide ski-up or abscission, accumulating slag in guide, a series of optimization and transformation were carried out, thus the hidden dangers of equipment were eliminated, the stable operation of casthouse cover manipulator was guaranteed, the operating conditions and dedusting effects in the regions of iron notch and air inlet were enhanced.
出处 《莱钢科技》 2014年第1期25-26,共2页 Laigang Science & Technology
关键词 炉前设备 揭盖机 行走机构 行走轮 导轨 casthouse equipment cover manipulator walking mechanism walking wheel guide
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部