5REILLY J J. Management process for complex underground and tunneling projects[J]. Tunneling & Underground Space Technology, 2000,3(2) : 31-44.
6MISHAC K, YEGIAN E, et al. Overbreak risk assessment in the athens metro TBM tunnels [J ]. Geotechnical Engineering for Transportation Projects, 2004,126 : 1516-1523.
7GEYER TAW, MORRIS M I, HACQUART R Y. Channel tunnel safety case: development of the risk criteria[C]. Amsterdam: Proceedings of the International Conference on Electric Railways in a United Europe, Neth, 1995.
8Van HASSELT D R S, HENTSCHEL V, et al. Amsterdam's North/South metro line[J]. Tunneling and Underground Space Technology, 1999, 14: 191- 210.
9SEO J W, CHOI H H. Risk-based safety impact assessment methodology for underground construction projects in Korea[J]. Journal of Construction Engineering and Management, 2008,134 (1): 72-81.
10Van der SCHAAF T W. Near-miss reporting in the chemical process industry[D]. Netherlands: Eind- hoven University of Technology, 1992.