电力系统短期运行充裕性评估及决策 被引量:5

Assessment and Decision-Making of Power System Short-Term Operation Adequacy
下载PDF
导出
摘要 大量随机波动性电源接入给电力系统运行充裕性带来了显著影响,如何准确评估运行充裕性以及基于运行充裕性进行调度决策是新能源电力系统运行面临的新问题。以风电为例,同时考虑来自电源和负荷的双侧随机因素,将传统可靠性指标改进推广到短期运行充裕性评估中,并在此基础上提出了一个新的充裕性指标,对指标的数学含义和计算方法进行了讨论。以含风电电力系统的机组组合为例,研究所提指标在短期运行充裕性决策中的应用。算例首先对RBTS系统进行了运行充裕性评估,其次给出了所提充裕性指标约束下的机组组合方案。结果表明,所提指标能够更准确地刻画随机因素对系统运行充裕性的影响,基于充裕性指标的机组组合决策能够给出不同充裕性水平下的机组启停方案和出力计划以及对应的系统充裕性量化值。研究成果为随机波动性电源大规模接入电力系统的短期运行充裕性问题提供了一套评估指标和评估方法。 Grid-connection of a lot of randomly fluctuating renewable resources greatly impacts the operation adequacy of power grid, so how to accurately assess the operation adequacy and the operation adequacy based scheduling decision are the new problems that the power grid containing new energy resources has to be faced with. Taking the wind farm for example and considering the bilateral random factors from power resources and load, several traditional reliability evaluation indexes are improved and spread into short-term operation adequacy assessment, and on this basis a new adequacy index is proposed and the mathematical meaning and calculation method of the proposed new index are discussed. Taking the unit commitment containing wind power system as example, the application of the proposed index in the decision of short-term operation adequacy is researched. In the case study, firstly the adequacy assessment of RBTS is performed, and then a unit commitment scheme under the constraint of the proposed adequacy index is put forward. Calculation results show that the proposed index can depict the impact of random factors on system operation adequacy more accurately, and the adequacy index based unit commitment decision can give unit commitment schedulings under different adequacy levels and output schemes as well as corresponding quantized value of system adequacy. Results of this research offer an assessment method and a set of assessment indices for short-term operation adequacy under large-scale grid-connection of randomly fluctuating power resources.
出处 《电网技术》 EI CSCD 北大核心 2014年第4期994-1000,共7页 Power System Technology
基金 国家科技支撑计划项目(2013BAA02B01) 国家自然科学基金项目(51177043) 中央高校基本科研业务费专项资金项目(11QX45)~~
关键词 风力发电 随机性 充裕性评估 运行失负荷期望 延迟失负荷概率 wind power generation randomness adequacy assessment operational expected load not served buffered loss of load probability
  • 相关文献

参考文献16

  • 1Maroto I G,Pezic M.LOLE and EDNS calculation in presence of RES,pump units and interconnections[C]//European Energy Market (EEM) 9th International Conference.2012,Alcobendas,Spain.
  • 2元博,周明,李庚银,宗瑾.基于可靠性指标的含风电电力系统的发电和运行备用的协调调度模型[J].电网技术,2013,37(3):800-807. 被引量:34
  • 3Billinton R,Allan R N.Reliability evaluation of power systems[M].New York:Plenum Press,1984:150-160.
  • 4Billinton R,Karki B.Unit commitment risk analysis of wind integrated power systems[J].IEEE Transactions on Power Systems,2009,24(2):930-939.
  • 5Ding X Y,Lee W J,Wang J X,et al.Studies on stochastic unitcommitment formulation with flexible generating units[J].Electric Power Systems Research,2010,80(1):130-141.
  • 6赖业宁,薛禹胜,高翔,王亮.发电容量充裕度的风险模型与分析[J].电力系统自动化,2006,30(17):1-6. 被引量:23
  • 7周辉,娄素华,吴耀武,侯云鹤,吴复立,毛承雄.发电系统一致性运行可靠性指标及其优化模型[J].中国电机工程学报,2009,29(13):72-79. 被引量:14
  • 8Rockafellar R T,Royset J O.On buffered failure probability in design and optimization of structures[J].Reliability Engineering & System Safety,2010,95(5):499-510.
  • 9Billinton R,Fotuhi-firuzabad M.Reliability framework for generating unit commitment[J].Electric Power System Research,2000,56(1):81-88.
  • 10盛骤,谢式千,潘承毅.概率论与数理统计[M].北京:高等教育出版社,1999:47-50.

二级参考文献61

共引文献85

同被引文献77

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部