期刊文献+

珠江路桥工程施工的几点技术探讨

Discussion of Several Techniques in Zhujiang Road Bridge Construction
下载PDF
导出
摘要 灌注桩基础、混凝土浇筑、钢绞线张拉质量的控制是桥梁施工中的重点,其质量好坏直接决定了桥梁的使用寿命。本文介绍了珠江路桥施工中灌注桩、拱梁结合处和钢绞线张拉三个重点、难点部位的质量控制和技术控制,以期说明正确的施工方案和注重施工细节不但能保证质量,而且能提高效率。 Control of grouting pile foundation, concrete pouring and steel strand tension quality are the focuses of bridge construction. Their quality directly determines the service life of bridge. The key and difficult quality control and technology control points of parts-grouting pile, arch beam junction and steel strand tension in Zhujiang Road Bridge construction are introduced in the paper. It is described that proper construction program and focus on construction detail not only can ensure construction quality, but also can improve efficiency.
作者 朱太旺
出处 《水利建设与管理》 2014年第3期25-28,共4页 Water Conservancy Construction and Management
关键词 灌注桩 支架 混凝土 预应力张拉 grouting pile bracket concrete pre-stressed tension
  • 相关文献

参考文献3

共引文献263

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部