摘要
该文针对预应力拉杆在攀钢轨梁厂万能轧机上使用阶段常出的故障现象进行了原因分析查找,提出优化措施,解决了常出故障的问题,取得了很好的效果和经济效益。
This paper prestressed rod in climbing rail beam factory universal mill use stage frequently in the fault phenomena are the reason analysis,and puts forward the search optimization measures,solve the problems often out of order,and achieved good effect and economic benefit.
出处
《液压气动与密封》
2014年第2期24-26,共3页
Hydraulics Pneumatics & Seals
关键词
预应力拉杆
液压
控制
优化措施
prestressed rod
hydraulic
control
optimization measures