期刊文献+

模糊生产系统中的多类型差异作业平行机批调度优化 被引量:2

Scheduling Parallel Batch-processing Machines with Non-identical Job Sizes and Multi-types in Fuzzy Manufacturing System
原文传递
导出
摘要 针对现实生产制造系统中存在的时间参数模糊化问题,采用梯形模糊数表征时间参数,给出了一种具有模糊加工时间、模糊交货期与模糊批次间隔的,以最小化制造跨度和最小化提前/拖期惩罚为目标的多类型差异作业平行机批调度问题模型。在问题求解方面,给出了一种具有量子行为的,采用混沌局部优化的混合粒子群算法,避免求解过程陷入局部最优。仿真实验验证了该算法具有可行性和有效性。 To solve the problems correlated with fuzzy temporal parameters in fuzzy manufacturing system, based on trapezoidal fuzzy number,a fuzzy parallel batch-processing machines with non-identical job sizes and mulit-types model for minimized makespan and minimized earliness/tardiness penalties which has fuzzy processing time, fuzzy due date and fuzzy interval between batches is introduced firstly. After that, to avoide getting into the local optimum, a hybrid quantum-behaved particle swarm optimization algorithm which has chaotic local optimizer is proposed for the optimization. At last, through the analysis of the simulating experiment results, the feasibility and efficency of the algorithm are approved.
出处 《模糊系统与数学》 CSCD 北大核心 2014年第1期158-167,共10页 Fuzzy Systems and Mathematics
基金 教育部人文社会科学研究青年项目(10YJC630165) 江苏省教育厅高校哲学社会科学基金资助项目(2012SJB630028)
关键词 批处理机 模糊环境 粒子群算法 量子行为 混沌 Batch-processing Machine Fuzzy Enviroment Particle Swarm Optimization~ QuantumBehavior Chaos
  • 相关文献

参考文献15

  • 1Uzsoy R. Scheduling a single batch processing machine with non-identical job sizes [J]. International Journal of Production Research, 1994,32 : 1615- 1635.
  • 2Sevaux M, Peres S D. Genetic algorithms to minimize the weighted number of late jobs on a single maehine [J]. European Journal of Operational Research, 2003,151 : 296- 306.
  • 3Damoclaran P, Manjeshwar P K, Srihari K. Minimizing makespan on a batch-processing machine with non identical job sizes using genetic algorithms[J]. International Journal of Production Economics,2006,103(2):8824891.
  • 4Melouk S, Damodaran P, Chang P-Y. Minimizing makespan for single machine batch processing with nonidentical job sizes using simulated annealing[J]. International Journal of Production Economics, 2004,87-141- 147.
  • 5王栓狮,陈华平,程八一,李燕.一种差异工件单机批调度问题的蚁群优化算法[J].管理科学学报,2009,12(6):72-82. 被引量:20
  • 6邵浩,陈华平,许瑞,程八一,贾兆红.优化差异工件单机批调度问题的混合微粒群算法[J].系统工程,2008,26(12):98-102. 被引量:6
  • 7杜冰,陈华平,杨勃,李小林.聚类视角下的差异工件平行机批调度问题[J].管理科学学报,2011,14(12):27-37. 被引量:6
  • 8Jing shing Yao, Kweimei Wu. Ranking {uzzy numbers based on decomposition principle and singed distance [J]- Fuzzy Set and System,2000,116(20):75-288.
  • 9Liem Tran, Lucien Duckstein. Comparison of fuzzy numbers using a fuzzy distance measure [J]. Fuzzy Set and System, 2002,130(5) 331 - 341.
  • 10Baoding Liu, Yiankui Liu. Expected value of fuzzy variable and fuzzy expected value model [J]. IEEE Transaction on Fuzzy Systems, 2002 : 1105 - 1122.

二级参考文献77

共引文献52

同被引文献18

  • 1POTTS C N, KOVALYOV M Y. Scheduling with batching: a review[J]. European Journal of Operational Research, 2000, 120(2) : 228-249.
  • 2MATHIRAJAN M, SIVAKUMAR A I. A literature review, classification and simple meta-analysis on scheduling of batch processors in semieonduetor[J]. International Journal of Ad- vanced Manufacturing Technology, 2006,29(9/10) : 990-1001.
  • 3LIU I. L, NG C T, CHENG T C E. Scheduling jobs with re- lease dates on parallel batch processing machines to minimize the makespan[J]. Optimization Letters,2014,8(1):307-318.
  • 4LIN Y K, LIN C W. Dispatching rules for unrelated parallel ma- chines scheduling with release dates[J]. International Journal of Advanced Manufacturing Technology, 2013,67 ( 1 ) : 269-279.
  • 5DAMODARAN P, VELEZ-GALLEGO M C. A simulated an- nealing algorithm to minimize makespan of parallel batch pro- cessing machines with unequal job ready times[J]. Expert Sys- tems with Applications,2012,39(1) : 1451-1458.
  • 6SCHALLER J E. Minimizing total tardiness for scheduling i- dentical parallel machines with family setups[J]. Computers Industrial Engineering, 2014,72(6) : 274-281.
  • 7LEI D M, WANG T. An effective neighborhood search algo- rithm for scheduling a flow shop of batch processing machines [J]. Computers Industrial Engineering, 2011, 61 (3) 739-743.
  • 8LIU J J, CHEN Q X, MAO N, et al. Bi-objective dynamic control of batch processor with non-identical jobs in mould manufaeturing[J]. International Journal of Production Re- search, 2013,51(6) : 1820-1835.
  • 9CEREKCI A, BANERJEE A. Dynamic control of the batch processor in a serial-batch processor system with mean tardi- ness performance[J]. International Journal of Production Re- search, 2010,48(5) : 1339-1359.
  • 10GUPTA A K, SIVAKUMAR A I. Controlling delivery per- formance in semiconductor manufacturing using Look Ahead Batching[J]. International Journal of Production Research, 2007,45 (3) 591-623.

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部