期刊文献+

基于VB的土石方断面测量工程量计算系统 被引量:4

Calculation of Earthwork Section Measurement System on Engineering Amount Based on VB
下载PDF
导出
摘要 土石方断面测量工程中,主要的工作是绘制横断面图,计算断面积,计算工程量。传统的手工处理方法既费时费力,不易修改,且绘图精度和成果准确性难以保证。针对手工处理方法的问题和不足,利用Visual Basic 6.0编程语言开发了"土石方断面测量工程量计算系统"。轻松实现断面数据的输入、修改、查询、删除等操作,系统根据断面数据自动生成断面图、计算横断面积和工程量,断面图及工程量成果可以方便的输出、打印或保存。 Earthwork section survey project, the main task is to draw cross section map, calculated area, engineering quan- tity calculation. Traditional manual method is time--consuming and laborious, not easy to modify, and the accuracy is dif- ficult to guarantee the accuracy and results of drawing. Aiming at the problems and shortcomings of manual processing method, using Visual Basic 6 programming language developed "earthwork section measurement engineering calculation system". Easily cross section data input, modify, query, delete operation, system according to the section data generation section, calculating the cross--sectional area and the volume of work, the measurement results, sections and engineering can be output, print or save.
出处 《北京测绘》 2014年第2期75-80,共6页 Beijing Surveying and Mapping
关键词 土石方工程 断面测量 工程量计算 系统开发 earthwork proj ect section measurement engineering calculation system development
  • 相关文献

参考文献10

二级参考文献21

共引文献32

同被引文献26

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部