摘要
随着城市轨道交通建设的快速发展,网络化运行的地铁线路大量出现换乘车站,许多换乘车站是与早年建设的车站进行换乘,受当时的技术条件限制和现代建设标准的提高,实现既有车站与新建车站设备系统合理衔接难度很大。如何保证既有线的正常运行,对新线的建设施工存在很大的挑战。介绍北京地铁既有2号线车公庄站与新建6号线换乘引起的10 kV高压电缆路径改造施工。
Many new metro lines stations have transfer functions with early constructed stations, it is very difficult to achieve proper connection with existing stations and new stations in term of the interface of equipment systems. How to ensure the regular operation of existing lines, there are big challenges for new lines construction. The paper introduces the 10 kV high-voltage cable line reconstruction of the existing Chegongzhuang station on Beijing metro line 2 for connection to transfer to new Line 6.
出处
《现代城市轨道交通》
2014年第2期30-32,共3页
Modern Urban Transit
关键词
地铁车站
高压电缆
改造
施工技术
metro station
high voltage cables
reconstruction
construction technology