大挑臂预应力盖梁支架施工技术 被引量:2

Construction Technology of Falseworks for Long Cantilever Prestressed Capbeams
下载PDF
导出
摘要 肇花高速公路狮岭高架桥大挑臂预应力盖梁属于国内首次采用35m跨六车道大挑臂预应力盖梁应用于高速公路上,具有较大的施工技术难度。施工中采用下设门洞,钢管支墩,贝雷架主梁支架结构形式,克服了交通组织难度,减少了投入费用,保证了工程质量,确保了施工安全,为以后类似桥梁施工提供了指导性意见。 As the first one in China, the six-lane 35m long cantilever prestressed capbeam has been used for the construction of Shiling Viaduc~.t Bridge of Zhaohua Expressway, which has many construction difficulties. In order to overcome the difficulty of the traffic organization, and reduce cost, the door-opening, steel pipe support pier and Bailey frame structures have been adopt- ed for the construction, which could ensure the quality of the project and ensure construction safety, and could provide refer- ence for bridge constructions in the future.
作者 包珍
出处 《广东公路交通》 2014年第1期51-53,共3页 Guangdong Highway Communications
关键词 大挑臂 盖梁 支架 施工技术 long cantilever capbeam falseworks construction technology
  • 相关文献

参考文献1

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部