摘要
应用计算机数值模拟和水力学模拟实验对柳州钢铁厂连铸中间包坝堰进行了优化设计,其优化设计研究结果对柳钢连铸生产具有指导意义-
Applying the methods of hydraulic analogy and numerical analogy of computers,the design of dam and weir in tundish of continuous casting in Liuzhou Iron and Steel Factory is optimized. The results are able to guide the production of continuous casting.
出处
《包头钢铁学院学报》
1999年第4期414-417,共4页
Journal of Baotou University of Iron and Steel Technology