期刊文献+

糯扎渡水电站导流洞临时堵头混凝土快速连续施工技术 被引量:4

Quick and successive concrete construction technology for temporary plug of diversion tunnel of Nuozhadu Hydropower Station
下载PDF
导出
摘要 糯扎渡水电站导流洞封堵施工工期十分紧张,是工程蓄水发电关键项目,为及时应对下闸后水位上涨带来的压力及风险,设计拟定在各条导流洞上游增设临时堵头。本文通过对导流洞临时堵头混凝土快速连续施工技术的总结,阐明临时堵体混凝土快速施工具体施工方法,为类似工程及今后水利水电应急抢险提供借鉴。 As the construction period of the plugging of the diversion tunnel for Nuozhadu Hydropower Station, the key item for the impoundment and power generation, is quite limited, additional temporary plugs are designed to be arranged at the upstream ends of all the diversion tunnels. Through the technical summarization made on the quick and successive concrete construction of the temporary plugs for the diversion tunnels, the specific construction method for the quick construction are expatiated herein, so as to provide some references for the similar projects and the emergency risk-elimination of water resources and hydropower projects concerned.
出处 《水利水电技术》 CSCD 北大核心 2014年第3期58-60,共3页 Water Resources and Hydropower Engineering
关键词 糯扎渡水电站 导流洞 临时堵头 混凝土快速连续施工 Nuozhadu Hydropower Station diversion tunnel temporary plug quick and successive concrete construction
  • 相关文献

同被引文献15

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部