以桑托斯工程四标段C段浅滩的成功浚挖为例,重点分析了大型耙吸挖泥船在浅滩施工中的难点、要点及重点注意事项,并提出了相应的施工方案和保障措施,为类似大型耙吸挖泥船的浅滩切削施工提供了参考。
Using the successful shoal dredging in section 4-C of Santos channel dredging engineering as an example, this paper analyzes the difficulties, key points and precautions in shoal dredging construction with large-scale trailing suction hopper dredger, and proposes an appropriate construction program and several safeguards as a reference for shoal dredging constructions with large-scale trailing suction hopper dredgers.