期刊文献+

时延网络化数控系统的建模与加工性能

Modeling and Contouring Performance of Networked CNC System with Delay
下载PDF
导出
摘要 网络化数控系统中,网络介入导致的时间参数(采样周期与时延)对数控加工性能的影响不可忽视.文中基于修正Z变换理论建立了网络化数控系统模型,确立了时间参数与数控系统加工性能指标的关系,定量分析了其对加工性能的影响机理.结果表明:时延及其抖动增大了多轴加工的轮廓误差;与时延相比,采样周期是加工性能的主要影响因素;时延引起的多轴加工不同步进一步恶化了加工性能;高速加工数控系统更应关注时间参数对加工性能的影响. Aiming at the significant influence of timing parameters (i.e.sampling period and delay)on the con-touring performance of networked CNC (Computer Numerical Control)systems due to the involved networks,this paper sets up a networked CNC system model with delay based on the modified Z transformation,and constructs the relationship between timing parameters and the contouring performance index,with the corresponding influence laws being also obtained.The results show that (1 )both the delay and its jittering increase the contour errors of multi-axis processing;(2)the sampling period is the primary factor influencing the contouring performance;(3 )the multi-axis control actuation asynchrony caused by delay leads to the degradation of contouring performance;and (4)more attention should be paid to the influence of timing parameters on the contouring performance of high-speed networked CNC systems.
出处 《华南理工大学学报(自然科学版)》 EI CAS CSCD 北大核心 2013年第11期96-101,共6页 Journal of South China University of Technology(Natural Science Edition)
基金 国家"863"计划项目(2011AA04A104 2012AA040909) 广东省重大科技专项(2010A080401006) 广东省精密装备与制造技术重点实验室资助项目(PEMT1203) 华南理工大学中央高校基本科研业务费专项资金资助项目(2014ZM0017)
关键词 网络化数控系统 时延 建模 采样周期 加工性能 networked CNC system delay modeling sampling period contouring performance
  • 相关文献

参考文献11

  • 1Kalman R E, Bertram J E. A unified approach to the theory of sampling systems [ J]. Journal of the Franklin Institute, 1959,5 (267) :405-436.
  • 2Kushner H J ,Tobias L. On the stability of randomly sam-pled systems [ J]. IEEE Transactions on Automatic Con- trol, 1969,14(4) :319-324.
  • 3Ray A, Halevi Y. Integrated communication and control systems : part I-analysis, and part II-design considerations [ J ]. Journal of Dynamic Systems, Measurements and Con- trol, 1988,110(4) :367-381.
  • 4Wittenmark B,Nilsson J,TOrngren M. Timing problems in real-time control systems [ C ]//Proceedings of the Ame- rican Control Conference. Washington : IEEE, 1995 : 2000- 2004.
  • 5Gupta R A, Chow M. Networked control system: overview and research trends [ J]. IEEE Transactions on Industrial Electronics ,2010,57 ( 7 ) :2527-2535.
  • 6Zhang L, Gao H, Kaynak O. Network-induced constraints in networked control systems-a survey [ J]. IEEE Trans- actions on Industrial Informatics,2013,9( 1 ) :403-416.
  • 7Richard J. Time-delay systems : an overview of some recent advances and open problems [ J]. Automatica, 2003,39(10) : 1667-1694.
  • 8Ryu M,Hong S. Toward automatic synthesis of schedula- ble real-time controllers [ J ]. Integrated Computer-Aided Engineering, 1998,5 ( 3 ) : 261 - 277.
  • 9Li Di ,Wan Jia-fu,Ye Feng,et al. Effect of time characteris- tics of software NC real time tasks on manufacturing accu- racy [ J ] Journal of South China University of Technology: Natural Science Edition ,2009,37 ( 2 ) : 1-5.
  • 10Jury E I. Theory and application of the Z-transform method [ M ]. New York : Krieger Pub Co. , 1973 : 15-19.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部