工程结算撤销权法律运用之要领——在时效期间内向法院或仲裁机构提出

下载PDF
导出
摘要 工程结算是工程管理中一个非常重要的工作和应该重点关注的问题。工程结算纠纷中所反映出来的问题涉及工程管理不到位的种种方面和法律风险主要体现在结算失误或错误而不能正确撤销,从而导致经济损失。本文根据国家法律的相关规定并结合笔者在律师实务工作中代理过的一件工程款结算纠纷案来简要分析工程结算中撤销权运用的法律问题,以供建筑施工企业在工程结算过程中参考。 Engineering settlement is a very important work in project management and should focus on the problem. Problems reflected in the engineering settlement dispute, involved in all aspects of project management does not reach the designated position, and the legal risk is mainly manifested in the settlement mistakes or errors and cannot be right to withdrawn, resulting in economic losses. According to the related provisions of state laws and combined with the writer in law practice work in the agency of a project and settlement due to simple talk about cancellation right use of legal problems in the engineering settlement, to provide the reference for the construction enterprises in the process of the construction settlement.
作者 徐江
出处 《北京仲裁》 2013年第2期93-99,共7页 Beijing Arbitration Quarterly
关键词 工程结算 撤销权 法律注意事项 engineering settlement legal considerations cancellation right
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部