摘要 At the beginning of 1990s, Shougang blast furnaces (BFs) No. 2, No. 4, No. 3 and No. 1 were rebuilt se quently for new technological modernization in succession. The campaign life of BFs No. 1, No. 3 and No. 4 reaches 16.4, 17.6 and 15.6 years, respectively, and the hot metal output of one campaign reaches 33.8, 35.48 and 26.37 Mt, respectively; the hot metal output of BF effective volume of one campaign reaches 13328, 13991 and 12560 t/m^3, respectively, which reaches the international advanced level of BF high efficiency and long campaign life. In BF desig-ning, several advanced BF long campaign technologies were adopted. BF proper inner profile was optimized, reasona- ble inner profile was adopted, and closed circulating soften water cooling technology was applied in 4 BFs. Double row cooling pipe high efficiency cooling stave was developed which could prolong the service life of bosh, belly and stack. Hot pressed carbon brick and ceramic cup hearth lining structure were applied and optimized. BF operation was improved continuously to ensure stable and smooth operation of BF. Hearth working condition control was strengthened, burden distribution control technology was applied to achieve reasonable distribution of gas flow, and heat load monitoring was strengthened to maintain BF reasonable working inner profile. Proper maintenance at the end of BF campaign was enhanced. Hearth and bottom service life was prolonged by adding titaniferous material and enhancing hearth cooling. Gunning of lining was carried out periodically for the area above tuyere zone. At the beginning of 1990s, Shougang blast furnaces (BFs) No. 2, No. 4, No. 3 and No. 1 were rebuilt se quently for new technological modernization in succession. The campaign life of BFs No. 1, No. 3 and No. 4 reaches 16.4, 17.6 and 15.6 years, respectively, and the hot metal output of one campaign reaches 33.8, 35.48 and 26.37 Mt, respectively; the hot metal output of BF effective volume of one campaign reaches 13328, 13991 and 12560 t/m^3, respectively, which reaches the international advanced level of BF high efficiency and long campaign life. In BF desig-ning, several advanced BF long campaign technologies were adopted. BF proper inner profile was optimized, reasona- ble inner profile was adopted, and closed circulating soften water cooling technology was applied in 4 BFs. Double row cooling pipe high efficiency cooling stave was developed which could prolong the service life of bosh, belly and stack. Hot pressed carbon brick and ceramic cup hearth lining structure were applied and optimized. BF operation was improved continuously to ensure stable and smooth operation of BF. Hearth working condition control was strengthened, burden distribution control technology was applied to achieve reasonable distribution of gas flow, and heat load monitoring was strengthened to maintain BF reasonable working inner profile. Proper maintenance at the end of BF campaign was enhanced. Hearth and bottom service life was prolonged by adding titaniferous material and enhancing hearth cooling. Gunning of lining was carried out periodically for the area above tuyere zone.
作者 ZHANG Fu-ming
出处 《Journal of Iron and Steel Research International》 SCIE EI CAS CSCD 2013年第9期53-60,共8页
关键词 blast furnace long campaign life hearth lining cooling stave operation control blast furnace long campaign life hearth lining cooling stave operation control
  • 相关文献

参考文献4

二级参考文献13

共引文献37

同被引文献84

引证文献7

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部