1Federation Internationale Des Ingenieurs-Conseils (FIDIC MDB). Conditions of Contract for Construction Multilateral Development Bank Harmonised Edition. General Conditions[Z]. June,2010.
2Guidelines procurement under IBRD Loans and IDA Credits[EB/ OL ]. http.//siteresources, worldbank, org/INTPROCURE- MENT/Resources/.
3[莫]托特蒂尔著,崔军译.FIDIC用户指南.1999年版红皮书和黄皮书实用指南[M].
4Institution of Civil Engineers. Engineering and Construction Con- tract. Guidance Note. Second Edition published by Thomas Tel- ford[Z]. London. November,1995.
5Perry,J. A. and Thompson,P. A. 1978. Construclion Finance and Cost Escalation. Proc. Instn. Civ[C]. Enginrs. Part 1, 1978,64, May, 347-351.
6Cesar, Scott. Price Adjustment Clauses. a Solution for dealing with Changing Materials Cnsts[Z]. 2009.
7The Government of the Philippines. Revised Guidelines for Con- tract Price Escalation[Z]. 2008.
8National Highway Authority of India (NHAI). NHAI Works Manual[M]. 2006.
9Pakistan Engineering Council (PEC). Standard Procedure and Formula for Price Adjustment (First Edition) [ Z]. March, 2009.
10Touran, All and Lopez, Ramon. Modeling Cost Escalation in Large |nfrastrueture Projects[J]. ASCE Journal of Construction Engineering and Management ,2006,132(8) .853-860.