3万t贮煤筒仓顶部混凝土浇筑技术概述——以同煤大唐热电二期2×300MW机组工程为例 被引量:1

Overview of the Concreting Technology Used on the Top of 30 000 t Coal Silo——Taking the Second Phase of the Project of 2×300 MW Unit in Datang Thermal Power Co., Ltd. of Datong Coal Group as an Example
下载PDF
导出
摘要 以同煤大唐热电二期2×300 MW工程为例,详细介绍了3万t贮煤筒仓顶部混凝土浇筑技术。此技术的关键是利用中心柱和筒壁作为支座,采用型钢临时支撑平台代替传统的筒体内部搭设脚手架的施工方法,在临时支撑平台上完成最终的混凝土浇筑施工。 Taking the second phase of the project of 2x300 MW unit in Datang Thermal Power Co., Ltd. of Datong Coal Group as an example, this paper introduces in detail the concreting technology used on the top of 30 000 t coal silo, the keys of which are making use of the center column and silo wall as the support, adopting the construction method of using the steel section temporary support platform instead of the traditional scaffold erection within the silo, and finally finishing the concreting construction on the temporary support platform.
作者 杨晓春
出处 《山西科技》 2014年第2期164-166,共3页 Shanxi Science and Technology
关键词 混凝土浇筑技术 贮煤筒仓顶部 临时支撑平台 施工技术 concreting technology top of coal silo temporary support platform construction technology
  • 相关文献

同被引文献8

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部