摘要 According to the special requirements of secondary mining of resources in gateway-and-pillar goaf in extra-thick seams of Shanxi, this paper presents a technical proposal of back stoping from level floors.Numerical simulation and theoretical analysis are used to investigate the compaction characteristics of cavities under stress as well as an appropriate mining height of the primary-mining layer based on different mining widths and pillar widths. For Yangjian coal mine, the mining thickness of the first seam during back stoping from level floor is determined to be 3 m, which meets the relevant requirements.Gateway-and-pillar goaf of a single layer has a range of influence of 9 m vertically. If gateway-and-pillar goaf occurs both in 9-1 and 9-5 layers, the range is extended to within 11.2 m. When the mining width of a gateway is less than 2 m or larger than 5 m, the gateway-and-pillar goaf in the upper layer of the primary-mining seam can be filled in and compacted after stoping. When the working face is 2 m away from the gateway and pillar before entering into it and after passing through it, the coal body under the gateway and pillar is subjected to relatively high stress. During mining of the upper layer, moreover, the working face should interlock the goaf in primary-mining layer for 20 m. According to the special requirements of secondary mining of resources in gateway-and-pillar goal in extra-thick seams of Shanxi, this paper presents a technical proposal of back stoping from level floors. Numerical simulation and theoretical analysis are ccsed to investigate the compaction characteristics of cavities under stress as well as an appropriate mining height of the primary-mining layer based on dif- ferent mining widths and pillar widths. For Yangjian coal mine, the mining thickness of the first seam during back stoping from level floor is determined to be 3 m, which meets the relevant requirements. Gateway-and-pillar goaf of a single layer has a range of influence of 9 m vertically. If gateway-and-pillar goaf occurs both in 9-1 and 9-5 layers, the range is extended to within 11.2 m. When the mining width of a gateway is less than 2 m or larger than 5 m, the gateway-and-pillar goal in the upper layer of the primary-mining seam can be filled in and compacted after stoping. When the working face is 2 m away from the gateway and pillar before entering into it and after passing through it, the coal body under the gateway and pillar is subjected to relatively high stress. During mining of the upper layer, moreover, the working face should interlock the goaf in primary-mining layer for 20 m.
机构地区 School of Mines
出处 《International Journal of Mining Science and Technology》 SCIE EI 2014年第2期143-149,共7页 矿业科学技术学报(英文版)
基金 Financial support for this work was provided by the National High-Tech Research and Development Program of China (No. 2012AA062101) the Priority Academic Development Program of Jiangsu Higher Education Institutions (No. SZBF2011-6-B35) the Graduate Students Innovation Fund of Colleges and Universities in Jiangsu Province (No. CXZZ12_0950)
关键词 二次开采 回采技术 特厚煤层 柱式 地板 背面 区级 压实特性 Gateway-and-pillar goaf Back stoping from level floor Secondary mining Numerical simulation Stress evolution