期刊文献+

含服务水平和提前期的服装供应链库存问题研究 被引量:10

Study on inventory problem of fashion supply chain with service level and lead time
下载PDF
导出
摘要 近年来服装行业的库存问题日益严重,为解决这个问题,研究了含有服务水平约束的、提前期内需求符合正态分布且提前期加速成本函数为连续型函数的两级服装供应链库存问题,为更加贴合实际情况,本文考虑运输费用对供应链总库存成本的影响。建立供应链库存成本的基本模型并确定决策变量,基于供应链总库存成本最小化的基础提出模型的求解算法,通过数值算例分析结果表明算法和模型的有效性及可行性,并着重分析了不同服务水平的初始值对最优解的影响,以证明其初始值对模型结果的影响极小可忽略。 In order to solve the inventory problem in current apparel industry, this article discussed the inventory problem of a two echelon supply chain which consists of a single-buyer and a single-vendor with service level constraint. For the purpose of meeting the actual situation, the demand during lead time is assumed to be normally distributed and the lead time can be shortened with continuous function. The impact of transport costs on the total cost of the inventory is also considered. Firstly, a basic model of the supply chain is setup and the decision variables are confirmed. Secondly, solution algorithm of the model based on the minimized inventory cost is proposed. Finally, through numerical examples, the effectiveness and feasibility of the model can be proved, with emphasis on the analysis of the influence of the initial value of various service levels on the optimal solution so as to demonstrate that the impact of the initial value on the result of the model is so small that it is negligible.
出处 《纺织学报》 EI CAS CSCD 北大核心 2014年第4期135-141,共7页 Journal of Textile Research
基金 国家自然科学基金资助项目(11071220 11201428) 浙江省自然科学基金资助项目(Y6110091) 浙江省高校重中之重学科开放基金(2013KF19)
关键词 服务水平约束 可控提前期 加速成本 两级供应链 库存 service level constraint controllable lead-time crashing cost two echelon supply chain inventory
  • 相关文献

参考文献14

  • 1庞彪.服装陷高库存危机[J].中国物流与采购,2012(14):38-39. 被引量:2
  • 2LIN Yujen. Minimax distribution free procedure with backorder price discount [ J ]. International Journal of Production economics, 2008(111) : 118 - 128.
  • 3OUYANG L Y, YEH N C, WU K S. Mixture inventory model with backorders and lost sales for variable lead time [ J ]. The Journal of the Operational Research Society, 1996, 47(6) :829 - 832.
  • 4LI Yina,XU Xuejun, YE Fei. Supply chain coordination model with controllable lead time and service constr- aint[J]. Computers & Industrial Engineering, 2011, 61(3) :858 -864.
  • 5OUYANG L Y, WU K S, HOC C H. Integrated vendor- buyer cooperative models with stochastic demand in controllable lead time [ J ]. International Journal of Production economics, 2004, 92 ( 3 ) :255 - 266.
  • 6LIAO C J, SHYU C H. An analytical determination of lead time with normal demand [J ]. International Journal of Operations and Production Management, 1991, 11(9) :72 -78.
  • 7MOON Me, CHOI S. A note on lead time and distributional assumptions in continuous review inventory models [ J ]. Computers & Operations Research, 1998, 25(11) :1007 - 1012.
  • 8PAN Jch, HSIAO Yc. Integrated inventory models with controllable lead time and backorder discountconsiderations [ J . International Journal of Production Economics, 2005, 93:387-397.
  • 9CHOI J W. Investment in the reduction of uncertainties in just-in-time purchasing systems [ J ]. Naval Research Logistics, 1994,41 (2) :257 - 272.
  • 10BOOKBINDER J H, CAKANYILDIRIM M. Random lead time and expedited orders in (Q, r ) inventory systems[ J]. European Journal of Operational Research, 1999,115(2) :300 -313.

二级参考文献28

  • 1Stalk G J.Time-The next source of competitive advantage[J].Harvard Business Review,1988,(July~August):41-51.
  • 2Simchi-Levi D,Kaminsky P,Simchi-Levi E.Designing and managing the supply chain:concepts,strategies and case studies[M].Mc Graw-Hill Higher Education,USA,2000.
  • 3Choi J W.Investment in the reduction of uncertainties in iust-intime purchasing systems[J].Naval Research Logistics,1994,41:257-272.
  • 4Moon I K,Choi S J.A note on leadtime and distributional assumptions in continuous review inventoty models[J].Computers&Operations Research,1998,25:1007-1012.
  • 5Bookbinder J H,Cakanyildirim M.Random lead time and expedited orders in (Q,r) inventory systems[J].European Journal of Operational Research,1999,115:300-313.
  • 6Hariga M A.Setup cost reduction in (Q,r) policy with lot size,setup time and lead-time interactions[J].Journal of the operational Research Society,2000,51:1340-1345
  • 7Si Wook Ryu,Kyung Keun Lee.A stochastic inventory model of dual sourced supply chain with lead-time reduction[J].International Journal of Production Economics,2003,81-82:513-524.
  • 8Wolff R G.Stochastic Modelling and the Theory of Queues[M].Prentice Hall,Englewood Cliffs,NJ,1989.
  • 9Pan J C H,Hsiao Y C,Lee C J.Inventory Modelswith Fixed and Variable Lead Ti me Crash CostsConsiderations. Journal of the Operational Re-search Society . 2002
  • 10Pan J C H,Lo M C,Hsiao Y C.Opti mal ReorderPoint Inventory Models with Variable Lead Ti meand Backorder Discount Considerations. Europe-an Journal of Operational Research . 2004

共引文献2

同被引文献64

  • 1梅晚霞,马士华.(Q,r)库存中的提前期压缩问题研究[J].中国管理科学,2007,15(6):73-77. 被引量:5
  • 2周优军,曹亮,潘义前.基于预订销售策略的生命周期产品库存模型[J].物流技术,2012,31(4):98-101. 被引量:2
  • 3励凌峰,黄培清.供应链中的易腐物品生产-库存协作研究[J].上海交通大学学报,2005,39(3):464-467. 被引量:13
  • 4PERRY M, SOHAL A S, RUMPF P. Quick response supply chain alliances in the Australian textiles, clothing and footwear industry [ J ]. International Journal of Production Economics, 1999, 62 ( 1 ) : 119 - 132.
  • 5ABERNATHY F H, DUNLOP J T, HAMMOND J H, et al. A Stitch in Time: Lean Retailing and the Transformation of Manufacturing: Lessons From the Apparel and Textile Industries [ M ]. London: Oxford University Press, 1999:2 - 3.
  • 6PAN A, LEUNG S Y S, MOON K L, et al. Optimal reorder decision-making in the agent-based apparel supply chain [ J ]. Expert Systems With Applications, 2009,36(4) :8571 -8581.
  • 7RUTH Banomyong, ANTHONY K C B. Muhimodal transport: the case of laotian garment exporters [ J ]. International Journal of Physical Distribution & Logistics Management,2001,31 (9) : 663 - 685.
  • 8CHOIT M,LO C K Y,WONG C W Y,et al. Green manufacturing and distribution in the fashion and apparel industries [ J ]. International Journal of Production Economics,2012(2) : 531 -531.
  • 9SILVER E A, MEAL H C. A heuristic selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenish- ment[J]. Production and Inventory Management, 1975, 14:64 - 77.
  • 10史成东,边敦新,苏菊宁.基于粗糙集和灰色的供应链知识共享风险预警[J].计算机工程与应用,2008,44(11):19-22. 被引量:7

引证文献10

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部