期刊文献+

模糊综合评价法在路基处理方案选择中的应用

Application of Fuzzy Comprehensive Evaluation in Selecting Subgrade Treatment Scheme
下载PDF
导出
摘要 采用多因素模糊综合评价模型对曹妃甸综合保税区A21路路基处理提出的三种方案进行优选,实践证明,该法能综合考虑评价因素的权重系数,使评价结果和方案选择更加实用、合理和可行。 The paper adopts multi-factors fuzzy comprehensive evaluation model to optimize the subgrade treatment of three kinds of schemes about A21 Highway subgrade in Caofeidian Comprehensive Bonded Zone. Practice has proved that this method can comprehensively consider the weight coefficient of the evaluation factors, and make the results of the evaluation and scheme selection more practical, reasonable and feasible.
作者 王淼
出处 《交通标准化》 2014年第7期36-39,共4页 Communications Standardization
关键词 模糊综合评价 路基处理 方案选择 评价模型 fuzzy comprehensive evaluation subgrade treatment scheme selection evaluation model
  • 相关文献

参考文献4

  • 1谢全敏,夏元友.边坡治理决策的改进层次结构模型及其应用[J].岩土工程学报,2002,24(1):86-88. 被引量:25
  • 2许树柏.实用决策方法-层次分析法原理[M].天津:天津大学出版社,1983.
  • 3L Mikhailov. Group Prioritization in the AHP by Fuzzy Preference Programming Method[J]. Computer & Opera- tions Research, 2004, 31 (2): 293 -301.
  • 4C Mohan, H T Nguyen. Reference Direction Interactive Method for Solving Multiobjeetive Fuzzy Programming Problems[J]. European Journal of Operational Research, 1998, 107(3): 599-613.

二级参考文献7

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部