摘要 针对大型水闸闸墩混凝土施工期温度控制与防裂比较困难的问题,同时考虑夏季高温施工的不利情况,以河口村水库溢洪道闸墩为例,基于温度场和应力场的三维有限元分析方法,通过研究入仓温度、通水冷却、后浇带等因素对闸墩开裂的影响,提出了控制入仓温度、通水冷却与设置后浇带相结合的温控防裂措施。结果表明,本文提出的温控措施效果较好。 In light of the difficulty in temperature control and crack prevention for large concrete sluice piers as well as considering adverse conditions of construction in summer, taking spillway pier concrete of Hekoucun reservoir for an instance, based on three dimensional finite element analysis of temperature field and stress field, this paper studies the influence of placement temperature, cooling water pipe, post poured strip on the cracking of concrete. And then practical temperature control measures are put forward by combination of controlling placement temperature, cooling water pipe and setting post poured strip. Calculation result shows that the proposed temperature control measure has good effect.
出处 《水电能源科学》 北大核心 2014年第4期99-101,124,共4页 Water Resources and Power
关键词 闸墩混凝土 夏季施工 三维有限元仿真 温控措施 后浇带 pier concrete construction in summer 3 D finite element simulation temperature control measures post poured strip
  • 相关文献

参考文献1

二级参考文献3

同被引文献20

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部