摘要
通过综合技术、经济比较设备按常规室外布置方式,GIS方式以及PASS方式后提出最终选择PASS解决方案,详细论述各方案的优缺点,为以后国内类似外部条件下的变电所改造工程设计提供借鉴。
The paper proposes final selection AASS project rangement way, GIS way and PASS way. The strong and weak by integrated technology, taking conventional outsloor ar- points of each project are deatiled in the paper, proposing reference of substution transformation project design for coming home outdoor conditions.
出处
《电气开关》
2014年第2期75-78,81,共5页
Electric Switchgear
关键词
牵引变电所
设备改造
布置方式
PASS
traction substation
equipment transiormation
arrangement way