期刊文献+

控压钻井自动节流管汇压力调节特性研究 被引量:6

Pressure Regulation Characteristics of Automatic Choke Manifold in Managed Pressure Drilling
下载PDF
导出
摘要 现代控压钻井作业中,依靠自动节流管汇施加和控制井口回压,从而间接控制井底压力。但由于阀门的压力调节特性与阀门开度存在较大的非线性,常规节流管汇很难通过单个节流阀实现全开度范围内的精确调节。为了提高控制精度,利用节流阀工作的3个状态,建立了压力调节特性与流量调节特性的对应关系,进而建立了节流管汇的压力调节特性模型,并对压力调节精度及流量对压力调节特性的影响进行了分析。研究分析表明,现有节流阀压力调节特性呈现一定非线性;通过优化阀芯可以增大节流阀的有效工作区间,但不能完全消除超调区间;钻井液排量对节流阀的压力调节特性影响较大,设计节流管汇时应考虑排量问题。 In modern managed pressure drilling operation ,automatic choke manifold is used to provide and control wellhead back pressure so as to control formation pressure .Due to the nonlinear relationship between regulating pressure and choke valve opening ,it is difficult to adjust the choke valve accurately by a single choke valve within the scope of full opening in conventional choke manifold .In order to enhance con-trolling precision ,the corresponding relation of pressure regulation performance and flow rate was estab-lished based on the three working states of choke valve ,the model of pressure regulation performance was also developed .By analyzing the pressure adjusting precision and the effect of flow rate on pressure regula-tion performance ,it is considered that pressure regulation performance of choke valve is somew hat non-lin-ear ,optimization of valve core can increase its effective working range ,but it can’t eliminate super-adjus-ting scope ,the flow rate of drilling fluids has a great effect on pressure regulation performance of choke valve ,the flow rate should be paid great attention w hen designing the choke manifold .
出处 《石油钻探技术》 CAS CSCD 北大核心 2014年第2期18-22,共5页 Petroleum Drilling Techniques
基金 国家重点基础研究发展计划("973"计划)项目"深井复杂地层钻井压力系统模型与规律"(编号:2010CB226704) 国家自然科学基金项目"基于模型预测控制理论与状态机架构的控压钻井压力控制方法研究"(编号:51374223) 中国博士后科学基金项目"基于井筒流体介电特性的钻井安全预警可行性研究"(编号:2013M541146)资助
关键词 控制压力钻井 节流管汇 节流阀 钻井液流量 压力控制 managed pressure drilling choke manifold choke valve flow rate of drilling fluid pressure control
  • 相关文献

参考文献10

  • 1Santos H M,Paul lan Reid,Jones J L,et al. Developing the mi cro-flux control method: part 1 : system development, field test preparation and results[R]. SPE 97025,2005.
  • 2Santos H M,Catak E,Kinder J I,et al. Kick detection and con- trol in oil based mud= real well test results using micro flux control equipment[R]. SPE 105454,2007.
  • 3Santos H, Reid P, Lage A. Opening new exploration frontiers with the micro flux control method for well design[R]. SPE 16622,2004.
  • 4Finley D B, Shayegi S, Ansah J, et al. Reservoir knowledge and drilling benefits comparison for underbalaneed and managed pressure drilling operations[R]. SPE 104465,2006.
  • 5Santos H M, Muir K J, Sonnemann P, et al. Optimizing and au tomating pressurized mud cap drilling with the micro-flux con- trol method[R]. SPE 116492,2008.
  • 6Angelo Calderoni, Giorgio Girola, Michele Maestralni. Microflux control and e-CD continuous circulation valves allow operator to reach HPHT reservoirs for the first time[R]. SPE 122270,2009.
  • 7LyonsJL.阀门技术手册[M].袁玉求,译.北京:机械工业出版社,1991:52-71.
  • 8王德玉,梅大成,刘绘新,谢冲,王启颜.工控机在多级节流井控系统中的应用[J].计算机测量与控制,2006,14(9):1173-1174. 被引量:6
  • 9张晓东,李俊华.基于Fluent的锥形节流阀流场数值模拟[J].石油矿场机械,2009,38(9):50-52. 被引量:24
  • 10张祥来.固定节流阀特性研究[J].天然气工业,2007,27(5):63-65. 被引量:13

二级参考文献7

共引文献40

同被引文献44

  • 1练章华,刘干,龚建文,易浩,刘远扬,张祥来.高压节流阀流场分析及其结构改进[J].石油机械,2004,32(9):22-24. 被引量:50
  • 2李宁.平板阀设计及其非线性研究[J].液压与气动,2007,31(6):19-21. 被引量:7
  • 3辜志宏,王庆群,刘峰,李丽娜,杜珂,潘建武.控制压力钻井新技术及其应用[J].石油机械,2007,35(11):68-72. 被引量:40
  • 4Hannegan D, Todd R J, Pritchard D M, et al. MPD-uniquely applicable to methane hydrate drilling[R]. SPE/IADC 91560, 2004.
  • 5Medley G H, Reynolds P B B. Distinct variations of managed pressure drilling exhibit application potential[J]. World Oil, 2006,227 (3): 41-44.
  • 6Silvang S A, Leuehtenberg C, Gil I C, et al. Managed-pressure drilling resolves pressure depletion-related problems in the development of the high-pressure high-temperature Kristin Field[R]. SPE/IADC 113672,2008.
  • 7Reitsma D, van Riet E. Feasibility study of utilizing an auto- mated annular pressure control system for managed pressure drilling in Mature Offshore Oilfields[R]. SPE 96646,2005.
  • 8Hannegan D M. Case studies-offshore manag edpressure drill- ing[R]. SPE 101855,2006.
  • 9Rehman S A. 3D managed-pressure drilling around a sault dome using coiled tubing: a case study-challenges and solu- tions[R]. SPE 102608,2006.
  • 10Runtuwene M, Suprihono S, Rizka D, et al. Pressurized mud cap drilling drastically reduces non-productive time in Soka Field, South Sumatera[R]. SPE/IADC 125311,2009.

引证文献6

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部