大型泥水盾构推进遇未探明群桩的分析及处理

An Analysis & Treatment of Pushing Large-scale Slurry Shield Running into Unverified Pile Group
下载PDF
导出
摘要 上海仙霞西路隧道工程北线泥水盾构推进遇到未探明的南陈巷周家浜桥桥桩,阐述遇桥桩的经过及盾构机切削部分桩体后参数的改变。通过处理方案的比选,采用套管法将桩基拔除的方案,拔除施工期间采取措施防止盾构下沉和周边土体的变形。桩基拔除后盾构顺利穿越桥桩影响区域。 Taking Shanghai West Xianxia Rd. tunnel project for example, its north line slurry shield has run into unverified pile group of Nanchenxiang Zhoujiabang Bridge during the pushing process. The paper describes the procedure of running into bridge piles and the parameters change of shield machine cutting partial pile body. Through the selection and comparison of treatment plans, the plan of pipe in pipe method to pull out pile foundation is adopted finally. During the pulling out construction period, measures are used to prevent shield settlement and surrounding soil body deformation, and the shield can cross the area infl uenced by bridge piles successfully after pulling out these pile foundations.
作者 荣建
出处 《中国市政工程》 2014年第2期70-72,111,共3页 China Municipal Engineering
关键词 泥水盾构 未探明群桩 桩基拔除 slurry shield unverified pile group pile foundation pulling out
  • 相关文献

参考文献4

二级参考文献26

共引文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部