摘要
以同江跨境铁路桥为例,结合项目所处地区严寒的气候特点,对如何安排深水桥梁施工组织进行了介绍,并对工期的确定方法进行了详细阐述,为今后类似桥梁施工组织设计提供了参考依据。
Taking the Tongjiang cross-border railway bridge as an example, combining with the climate characteristics of projects in cold area, in- troduced how to arrange the construction organization of deep-water bridge, and elaborated in detail the determination methods of construction pe- riod, provided reference basis for future similar bridge construction organization design.