柳南客专桥隧地段信号设备安装

Liuzhou to Nanning Passenger Dedicated Line Bridge and Tunnel Lots Signaling Equipment Installed
下载PDF
导出
摘要 根据柳南客运专线桥梁占47.25%、隧道占26.29%的线路情况,按照中国铁路总公司对高速铁路信号施工技术标准以及国家和铁路行业标准的要求,结合现场实际的区间信号设备的安装方法和步骤,对桥隧地段信号设备安装进行简要阐述。 According to Nanning, Liuzhou Railway Bridge accounted for 47.25%, accounting for 26.29% of the tunnel line conditions, according to the China Railway Construction Corporation for the high-speed railway signaling and railway technical standards and national industry standards, combined with the actual site of the interval signal devices installation methods and procedures for bridges and tunnels lots signaling equipment installed briefly described.
作者 魏平
出处 《科技与创新》 2014年第4期35-35,38,共2页 Science and Technology & Innovation
关键词 客运专线 桥隧 信号设备 安装方法 passenger line bridges and tumnels signaling equipment installation method
  • 相关文献

参考文献1

  • 1中国铁路通信信号集团公司.铁建设[2010]241号高速铁路信号工程施工技术指南[S]北京:中国铁道出版社,2011.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部