期刊文献+

基于根方差法的MIS开发项目缓冲区研究 被引量:7

Study on the Buffer of MIS Development Projects Based on the Root Variance Method
下载PDF
导出
摘要 针对信息系统开发项目低成功率的特点,引入关键链,建立基于根方差法的项目关键链缓冲区模型,对缓冲区的设置与管理进行研究,改进传统的关键链缓冲区模型。算法求解上,设置信息系统开发项目工序的复杂度和资源紧张度两个调整参数,对缓冲区大小进行计算。最后,通过算例分析说明模型的实用性。 According to the low success rate of development projects about information system, critical chain buffer model of project based on the root variance method is established by introducing the critical chain. It is beneficial to set and man- age the buffer, and to improve the traditional critical chain buffer model. In the algorithm, the model sets the process com- plexity and resource intensity of development projects about information system, and then it is used to calculate the buffer size. Finally, the model shows the practicability through the analysis of the example.
出处 《科技管理研究》 CSSCI 北大核心 2014年第8期215-218,共4页 Science and Technology Management Research
基金 广西壮族自治区人文社会科学项目"项目管理在MIS开发中的应用研究"(2011105951201M42)
关键词 信息系统开发 缓冲区模型 根方差法 关键链 development of information system root variance method buffer model critical chain
  • 相关文献

参考文献10

  • 1LONG L D, OHSATOA. Fuzzy eritic',d chain method for project scheduling under resource constraints and uncertainty [ J]. Interna- tional Journal of Project Management. 2008, 26 (6) : 688 -698.
  • 2张静文,胡信布,王茉琴.关键链项目计划调度方法研究[J].科技管理研究,2008,28(3):280-283. 被引量:18
  • 3TUKEL O I, ROM W O, EKSIOGLU S D. An investigation of buffer sizing techniques in critical chain scheduling [ J ]. European Journal Of Operational Research. 2006, 172 (22) : 401 -416.
  • 4周阳,丰景春.基于排队论的关键链缓冲区研究[J].科技进步与对策,2008,25(2):174-176. 被引量:26
  • 5GOLDRATI" E M. Critical Chain [ M ]. Great Ban:ington, Mass. USA: The North River Press Publishing Corporation, 1997.
  • 6NEWBOLD R C. Project Management in the Fast Lane : Applying the Theory of Constraints [ MI. Boca Raton. Fla, USA: the St. Lucie Press, 1998.
  • 7ZINOV Y, RADOVIL S K Y. A Quantitative Approach to Estimate the Size of the Time Buffer in the Theory of Constraints [ J ]. Interna- tional Journal of Production Economics. 1998, 55 (2) : 113 - 119.
  • 8HERROEL E W, LEUS R. On the Merits and Pitfalls of Critical Chain Scheduling [ J]. Journal of Operations Management. 2001, 19 (5): 559-577.
  • 9褚春超.缓冲估计与关键链项目管理[J].计算机集成制造系统,2008,14(5):1029-1035. 被引量:88
  • 10BLACKSTONE J H, COX J F, SCHLEIER J G. A tutorial on pro- ject management from a theory of constraints perspective [ J]. Inter- national Journal of Production Research. 2009, 47 (24) : 7030 - 7045.

二级参考文献51

共引文献116

同被引文献80

引证文献7

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部