期刊文献+

论技术成熟度评价和风险管理在装备研制中的关系 被引量:4

On Relationship between Technology Readiness Assessment and Risk Management in Equipment Development
下载PDF
导出
摘要 装备研制项目研制周期长,系统复杂,风险因素多。应用技术成熟度评价和风险管理可有效地对项目风险进行识别,评估。本文分析了技术成熟度和风险管理的概念,研究了两者的相同点和不同点,指出了它们在武器装备研制中结合使用的方向。 The equipment development project has longer R&D cycle, complicated system, and too many risk factors. It is effective to use technology readiness assessment (TRA) and risk management (RM) in risk identification and assessment of equipment development project. This paper analyzes the concept of TRA and RM, researches the commonalities and differences between TRA and RM, and points out the trend of using them in combination in equipment development project.
作者 卢新来
出处 《南京航空航天大学学报(社会科学版)》 2014年第1期54-57,共4页 Journal of Nanjing University of Aeronautics & Astronautics(Social Sciences)
关键词 技术成熟度评价 风险管理 装备研制 technology readiness assessment risk management equipment development
  • 相关文献

参考文献5

  • 1耿汝光.大型复杂航空产品项目管理[M].北京:航空工业出版社,2012:141-177.
  • 2程文渊.技术成熟度评价方法的国防科研应用实践研究[C]//探索创新交流——第四届中国航空学会青年科技论坛文集,2012:24-31.
  • 3Department of Defense, Defense Acquisition Universi- ty, Defense Systems Management College. Risk Man- agement Guide for DoD Acqusition[R]. 1998:4-25.
  • 4Department of defense. DoDI 5000.02: Operation of the Defense Acquisition System[R]. 2008:24-25.
  • 5DoD 4245.7 M. Transition from Development to Pro- duction[R]. 1985:7-9.

共引文献2

同被引文献33

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部