摘要 由于我国还没有针对大型压裂施工制定装备配置与连接规范,各工程服务商大多根据自身条件进行配置,无法达到经济安全作业要求。为此,在分析国内外大型压裂施工现状的基础上,结合国内外在非常规油气开发过程中所取得的经验以及国产压裂装备研制和台架试验中所取得的研究成果,从主体装备的选择与配置、施工参数的选择、配液与供砂以及地面高低压管汇的连接等方面,提出我国大型压裂装备施工配置方案以及地面管汇系统连接要求。 There are no specifications for equipment configuration and connection for large fracturing construction in China and service providers conduct the configuration according to their own conditions. The configuration cannot reach the requirement of economical and safe operations. Therefore, the paper analyzes the current situation of domestic and foreign fracturing construction, refers to the experience obtained in unconventional oil-gas development at home and abroad, and examines the research achievements of domestic fracturing equipment development and bench test. Then, it discusses the selection and configuration of main equipment, construction parameters selection, fracturing liquid preparing, sand supply and connection between low and high pressure manifolds on ground. Finally, it proposes the construction configuration scheme for large fracturing equipment in China and the connection requirement for ground manifold system.
出处 《石油机械》 北大核心 2014年第4期67-71,共5页 China Petroleum Machinery
基金 国家"十二五"油气重大专项"3000型成套压裂装备研制及应用示范工程"(2011ZX05048)
关键词 大型压裂施工 压裂装备 配置方案 高压管汇 低压管汇 管汇连接 large fracturing construction fracturing equipment configuration scheme high pressure manifold low pressure manifold manifold connection
  • 相关文献

参考文献4

共引文献16

同被引文献83

  • 1冯志成,周思柱,李美求,李方淼.三通Y型管汇冲蚀规律研究[J].材料保护,2019,52(12):29-33. 被引量:15
  • 2邹忠林,阎家树.原料气预热器法兰断裂原因分析[J].机械工程师,2007(8):26-27. 被引量:1
  • 3SYT6270-2012,石油钻采高压管汇的使用、维护、维修与检测[S].
  • 4SYT5211-2009,压裂成套设备[S].
  • 5吴汉川,李莉莉,彭平生,等.连续输砂装置[P].中国专利,ZL201320405651X,2013-07-09.
  • 6McNeil F, Gijtenbeek K V, Domelen M V. New hy-draulic fracturing process enables far-field diversion inunconventional reservoirs [R] . SPE 152704, 2012.
  • 7Surjaatmadja J B, East L E. Efficient coiled-tubing frac-turing for proppant-placement assurance and contingen-cy-cost mitigation [R] . SPE 150514, 2012.
  • 8Stanojcic M, Rispler K. How to achieve and control bra- nch fracturing for unconventional reservoirs: Two novelmultistage-stimulation processes [R] . SPE 136566, 2010.
  • 9McNeil F, Harbolt W. New multistage fracturing proc- ess offers real-time control of rate and proppant concen-tration at the perforations [R] . SPE 162827, 2012.
  • 10Gijtenbeek K V, McNeil F, Massaras L. New coiled-tubing-deployed multizone hydraulic fracturing: An un-conventional process for unconventional reservoirs[R] . SPE 159340, 2012.

引证文献13

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部