摘要
房屋混凝土模板当采用扣件式钢管的高大支模架搭设时,施工方案的编制内容及方法具有很高的要求及严密性。建质[2009]87号中有具体的编写内容。论文就如何进行细化及合理编写作了较为系统地介绍。在具体方案实施过程中,通过实施经验,从钢管规格及参数选用、扣件承载力确定、监测点设置、提高支架的刚度等方面来阐述,为实际工程提供参考。
Building concrete form when using tall steel tubular formwork erection, construction program content and methods of preparation have high demands and rigor, although construction quality [2009] No. 87 in the PreParation ofspecific content.But how to be refined and made more reasonable this writing systematically introduced. In the process of implementation of specific programs, through the experience of implementing the specxfieatlons and parameters are chosen from steel, fasteners bearing capacity determining, monitoring point settings, etc. to improve the rigidity o fthe stent to elaborate, a reference value of the project.
出处
《工程建设与设计》
2014年第4期123-125,共3页
Construction & Design for Engineering
关键词
高大支模
方案编制
扣件式
应用
监测
tall formwork
programming
fastenvr type
application
monitor