摘要
根据线路设备条件、客流预测、车辆配属和运营水平等实际情况,对杭州地铁1号线采用开行主支交路运行的方案。对主支交路运行方案中需考虑的同站台换乘问题及首末班车问题进行研究,从调度调整、车站客运组织及列车客运组织等方面对方案的实施进行阐述,并对开行主支交路运行方案的实践经验进行总结。
Main-branch cross routing operation plan was adopted in Hangzhou Metro Line 1 according to the line equipment conditions,passenger flow forecast,auxiliary equipment and operational ability,etc.This article considered the passenger transfer problem in the same platform,and the first and last shuttle problem.The actual implementation of the plan was discussed and illustrated in detail in view of scheduling adjustments,station passenger organization and train passenger organizations.Finally,the experiences of actual implementation were concluded.
出处
《都市快轨交通》
北大核心
2014年第1期24-27,共4页
Urban Rapid Rail Transit
关键词
城市轨道交通
杭州地铁1号线
主支交路
运行方案
同站台换乘
urban rail transit
Hangzhou metro line 1
main-branch routing
operation plan
transfer problem in the same platform