摘要
易结晶流体的输送过程中,常出现管路、设备堵塞问题,影响生产的正常进行。本文对此进行分析,提出解决方案,为今后同类管路输送系统的设计提供参考。
Crystallization of the fluid delivery process, often appeared normal piping, equipment plugging problems affecting production. In this paper, this analysis, propose solutions, to provide a reference for the design of future similar pipeline transportation systems.
出处
《山东化工》
CAS
2014年第3期140-141,共2页
Shandong Chemical Industry
关键词
易结晶物
堵塞
冲洗
easy crystals
block
rinse