大渡河猴子岩水电站正常蓄水位研究 被引量:2

Research on normal storage level of Houziyan Reservoir on Dadu River
下载PDF
导出
摘要 针对猴子岩水电站的开发任务和工程特点,在分析淹没敏感点的基础上,提出了正常蓄水位比选的原则,并拟定了1 852 m和1 842 m两种正常蓄水位方案。通过综合比较蓄水对库尾丹巴古碉群、水库淹没、环境的影响及工程建设条件与枢纽布置及经济指标等多因素,确定猴子岩水电站正常蓄水位为1 842 m。虽然电站水头减少了10 m,但避免了对丹巴古碉群产生不利影响,减轻了滑坡和生态风险,实现了开发与保护并重的目标。 Normal storage level is an important determinant parameter for the scale of a hydropower station and inundation range of reservoir. In the light of development tasks and the characteristics of Houziyan Hydropower Station and based on analysis of sensitive spots, the comparison and selection principle of NSL is determined and 2 storage level schemes of 1852 m and 1842 m are preliminarily selected. Through comparison of inundation impact on the ancient bunker group in the reservoir tail, reservoir inundation, environmental impact and the project construction condition, layout of hydro-complex as well as economic indexes etc. , the scheme of 1842 m is determined. For the 1842 m scheme, although the water head of the power station is reduced by 10 m, the unfavorable impact on the ancient bunker group can be avoided, the landslide and ecological risks can be mitigated and multi-win of hydropower development and protection will be realized.
出处 《人民长江》 北大核心 2014年第8期39-41,共3页 Yangtze River
关键词 正常蓄水位 环境影响 猴子岩水电站 大渡河 normal storage level environmental impact Houziyan Hydropower Station Dadu River
  • 相关文献

参考文献4

二级参考文献5

共引文献12

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部