猴子岩水电站高面板堆石坝设计 被引量:15

Design of high concrete face rockfill dam of Houziyan Hydropower Station
下载PDF
导出
摘要 大渡河猴子岩水电站混凝土面板堆石坝为目前世界上已建和在建的同类型第二高坝,具有坝高、河谷狭窄、抗震设计烈度高等特点,其勘测设计工作难度大。经过大量试验研究并结合工程特点,设计人员在坝体变形控制、基础处理设计、防渗止水结构、结构抗震设计等方面采用创新方法,吸收了300米级建坝理念进行设计。详细介绍了大坝布置、坝体分区与坝料设计、坝基处理、趾板、面板、分缝和止水、大坝抗震措施设计等。可为类似高地震裂度区狭窄河谷上的面板坝设计、施工提供参考借鉴。 Houziyan CFRD characterized as significant height, narrow river valley and high seismic intensity, is the second-highest dam of CFRDs built and being built in the world, so difficulties exist in its engineering design. Through a lot of tests and considering the features of the Houziyan dam, we have adopted several innovative methods for dam deformation control, founda-tion treatment, water-sealing and anti-seepage structure, anti-seismic design, which has adopted the hydraulic structure de-sign concepts of 300m-high level dam. The design solutions are presented in detail including dam layout, dam partition and de-sign of filling materials, foundation treatment, toe slab, face slab, joint design and water-sealing, anti-seismic measures.
作者 窦向贤
出处 《人民长江》 北大核心 2014年第8期42-45,54,共5页 Yangtze River
关键词 面板堆石坝 分缝 止水结构 抗震措施 猴子岩水电站 CFRD joint water-sealing structure anti-seismic solution Houziyan Hydropower Station
  • 相关文献

参考文献3

  • 1猴子岩水电站大坝工程标招标设计报告[R].成都:中国水电顾问集团成都勘测设计研究院,2011.
  • 2猴子岩水电站面板堆石坝接缝止水结构及施工工艺研究[R].北京:中国水利水电科学研究院,2010.
  • 3熊泽斌,杨启贵,张运建.水布垭高面板坝设计[J].人民长江,2007,38(7):19-21. 被引量:10

二级参考文献3

  • 1J.Barry Cooke.混凝土面板堆石坝的趾板,见:混凝土面板堆石坝国际研讨会论文集.2000,9:18-24.
  • 2Bayardo Materon, Rui Mori. Concrete face roekfill dams construction features. Barry cooke volume concrete rockfill dams, Beijing, China,2000: 177 - 219.
  • 3苗树英,白昭鹏.面板堆石坝挤压式混凝土边墙垫层固坡技术研究.西安:陕西人民出版社,2002,9:457-463.

共引文献9

同被引文献122

引证文献15

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部