期刊文献+

灰岩筑坝料现场碾压、载荷及直剪试验研究 被引量:4

Study on rolling,loading test and direct shear test of limestone for dam construction
下载PDF
导出
摘要 大坝填筑施工前必须对填筑料进行现场碾压试验以确定合理的碾压参数,并对设计控制标准进行复核。通过开展猴子岩面板堆石坝现场生产性碾压、载荷及直剪试验,得到了堆石料干密度、孔隙率、渗透系数、变形模量等参数的准确结果。分析表明,色龙沟料场灰岩堆石料的抗滑稳定性、抗承载及抗变形能力较好,设计填筑压实标准合理。 Before filling construction of a CFRD, in-situ rolling tests should be carried out to determine reasonable rolling pa-rameters, also through which the design control standard can be rechecked. By conducting rolling and loading test as well as di-rect shear field test of CFRD at Houziyan Hydropower Station, accurate results of dry density, porosity, permeability coefficient and elastic modulus were obtained. The analysis results show that anti-sliding stability, loading capacity and anti-distortion capacity of limestone material in Selonggou material field is good, the designed filling compaction standard is reasonable.
出处 《人民长江》 北大核心 2014年第8期92-95,共4页 Yangtze River
关键词 灰岩 碾压试验 载荷试验 直剪试验 limestone rolling test loading test direct shear test
  • 相关文献

同被引文献27

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部