摘要
为了预测突水突泥灾害发生的可能性和规模,针对隧道施工中突水突泥灾害的影响因素较多,且各因素相互关联,具有很强的模糊性,提出了利用模糊综合评判方法来评判隧道的突水突泥风险,实例证明其结果与实际情况具有较好的一致性。并针对隧道的突水突泥灾害提出了有针对性的控制措施。这对于制定合理的超前地质预报措施、拟定有效的防灾方案、保障隧道安全施工,均有非常重要的意义。
In order to predict the possibility and scale of water bursting and mud surging, in view of the influ- encing factors that are interconnected and with great fuzziness, fuzzy comprehensive evaluation method is proposed to judge the risk of disaster. Example shows that results of the approach above have a good consistency with the ac- tual situation, and pertinence control measures are put forward. What have done in the paper are of great signifi- cance to make reasonable measures of advance geological forecast, develop an effective disaster prevention plan and protect the safety of the tunnel construction.
出处
《灾害学》
CSCD
北大核心
2014年第2期69-71,共3页
Journal of Catastrophology
基金
河北省教育厅高等学校科学技术研究项目(Z2011224)
河北省科学技术研究与发展计划项目(11237174)
关键词
隧道工程
突水突泥
模糊综合评价
控制措施
tunnel engineering
water bursting and mud surging
fuzzy comprehensive evaluation
control measure