期刊文献+

大吨位T形刚构桥转体施工风险评估与对策研究 被引量:4

Construction Risk Assessment and Counter Measures of Rotation Construction of LargeTonnage T-shaped Rigid Frame Bridge
下载PDF
导出
摘要 大吨位T形刚构转体桥施工作业技术难度大,不确定因素多,对其施工过程展开风险评估研究非常必要。根据风险评估与管理理论,利用综合识别法识别出转体过程中的施工风险因素,并对转体过程的主要风险源进行风险评估,提出相应施工风险控制对策,为今后类似桥梁施工管理及风险评估提供借鉴。 Due to the technical difficulty and uncertainty of rotation construction of large tonnage T-shaped rigid frame bridge,it is necessary to perform construction risk assessment.Based on the risk assessment and management theory,the risk factors in the construction process are identified accord-ing to the comprehensive identification method.The main risk source of the construction process is as-sessed and the corresponding risk control measures are proposed.It is a good reference for the con-struction management and risk assessment of similar bridges.
出处 《交通科技》 2014年第2期25-27,共3页 Transportation Science & Technology
基金 内蒙古自治区交通科技项目(NJ-2012-18)资助
关键词 大吨位 T形刚构桥 施工风险 风险评估 控制对策 large tonnage T-shaped rigid frame bridge construction risk risk assessment control measures
  • 相关文献

参考文献4

  • 1刘碧萍.浅析“平面转体法”桥梁施工的特点和应用[J].中国高新技术企业,2009(7):172-173. 被引量:6
  • 2项春领.大跨度斜拉桥施工风险分析与对策研究[D].上海:同济大学,2006.
  • 3PATTERSON F D, NEAILEY K. Arisk register data base system to aid the management of Project risk [J]. International Journalof Projeetmanage- ment,2002(20) :365-374.
  • 4宋刚.T形刚构桥水平转体施工控制及施工风险评估研究[D].西安:长安大学,2012.

共引文献5

同被引文献15

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部