松花江漫滩区紧邻建筑物深基坑施工技术 被引量:3

Construction Technology of the Deep Foundation Excavation Adjacent Buildings in Songhua River Floodplain Areas
下载PDF
导出
摘要 以哈尔滨地铁1号线太平桥站为例,对地铁车站深基坑距离条形基础建筑物仅有0.75m的保护施工进行了重点研究,在实施过程中通过采取"下延式钢管导墙"、刚性接头及小幅段单爪成墙等手段,以及设置隔离桩、注浆、墙缝探挖、加强支撑和监测等综合施工措施,有效地保护了邻近建筑物的安全。 Taking Taipingqiao Station of Harbin Subway Line 1 for example, this paper made research on the protection construction that the distance is only 0.75m between strip foundation building and deep excavation in metro station. In the process of implementation, by taking guide wall of decurrent steel pipe, rigid joint and single grapple construction unit to a wall, and setting isolation to digging pile, grouting, wall joints explore digging, strengthen support and surveillance and other comprehensive construction measures, the safety of adjacent buildings was effectively protected.
出处 《施工技术》 CAS 北大核心 2014年第7期26-30,共5页 Construction Technology
关键词 地铁车站 深基坑 富水砂层 施工技术 监测 Key words, subway stations deep foundation excavation water-rich sand stratum construction monitoring
  • 相关文献

参考文献3

二级参考文献5

共引文献50

同被引文献18

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部