4I.Barclay and Z.Dann.New-product-development performance e- valuation: a product-complexity-based methodologylJ].IEE Proc -Sci Meas Techno 1,2000,147(2):41-55.
5Helen Driva,Kulwant S.Pawar and Unny Menon.Performance e- valuation of new product development from a company perspective [J].In- tegrated Manufacturing Systems,2001,12(5):368 378.
6Osawa Y. And Murakami M., Development and application of a new methodology of evaluating industrial R&D projects[j]. R&D Manage., 2002, 32( 1): 79- 85.
7Hart, S., Jan Hultink E., Tzokas N. , and Cornmandeur H.R.Industrial companies evaluation criteria in new product development gates [J]. Journal of Product Innovation Management, 2003, 20 (1) : 22-36.
8Eilat H, Golany B, and Shrub A.Constmcting and evaluating bal- anced portfolios of R&D projects with interactions: ADEA based method- ology [J]. Eur. J. Oper. Res.,2006, 172 (3) : 1018- 1036.
9Bitman W R. And SharifN. A conceptual framework for ranking R&D projects [J]. IEEE Tran. Eng. Management, 2008, 55 (2): 267- 278.
10Wen-Pai Wang.Evaluating new product development performance by fuzzy linguistic computing[J].Expert Systems with Applications,2009,36: 9759-9766.
8Henriksen A.D. and Traynor A.J., A practical R&D project ranking tool [J]. IEEE Trans. Eng. Manage., 1999, 46 (2): 158-170.
9Osawa Y. and Murakanfi M., Development and application of a new methodology of evaluating industrial R&D projects [J]. R&D Manage., 2002, 32 (1): 79 - 85.
10Reisinger H., Cravens K.S., and Tell N., Prioritiz- ing performance measures within the balanced scorecard framework [J]. Manage. Int. Review, 2003, 43 (4): 429-437.