EPC模式下项目成本控制的主要环节包括设计阶段、采购阶段和施工阶段。设计阶段是项目建设的源头,这一阶段的工作对整个项目的造价影响程度最大,本文从设计阶段的成本控制特点,对设计阶段成本控制进行了初步的探讨。
The main parts of project cost under EPC mode include design stage, procurement and construction stages. The design phase is the source of project construction. The work of this phase has great impact on the entire project. Based on the analysis of cost control characteristics of design stage, this paper carries on a preliminary discussion.