摘要
随着我国社会主义市场经济的飞速发展,我国的地铁工程也在发展之中,越来越多的工程改变了传统的定额计价方式,采用了更为科学的工程量清单计价方式。在工程量清单计价方式下,建设单位在招投标的过程中越来越重视招标控制价的编制,这直接导致招标评审要求的变化,进一步对招标控制价的编制内容、范围和质量提出了更高的要求。当前,我国虽然已经有了相应的法律规范招投标,但仍存在一些问题,尤其是有些工程项目的招标控制价的编制质量不高,会导致施工过程中的计价纠纷,严重的还会影响到工程项目的安全和质量。
With the rapid development of China's socialist market economy, China's subway projects are also under development. A growing number of projects has changed the traditional fixed pricing method, use a more scientific way of bill of quantities. Under the bill of quantities way, construction units paying more attention on the preparation of bidding control price in bidding process, which directly leads to the changes in the requirements of the tender evaluation, further puts forward higher requirements for the preparation contents, range and quality of bidding control price. At present, even though China has had a corresponding legal tender, but there are still some problems, especially in the preparation of quality control at some of the tender project is not high, which will result in the pricing disputes of construction process, but also seriously affect the safety and quality of the project.
出处
《价值工程》
2014年第14期76-77,共2页
Value Engineering
关键词
招标控制价
投标报价
影响
对策
bidding control price
tender quoted price
influence
countermeasures