期刊文献+

江都水利枢纽集中控制系统的研究与探讨 被引量:8

Research and Discussion of Centralized Control System of Jiangdu Water Conservancy Project
下载PDF
导出
摘要 大型泵站和水闸等水利工程的自动化监测、控制已普遍实施,集中监测中心也有使用,而大型水利枢纽多个工程的远程集中控制、调度和监视尚有待探索。在江都水利枢纽原有自动控制系统的基础上,探索集中控制系统的建设方案、功能要求和管理措施,建立安全可靠和智能化程度较高的集中控制系统,实现多个工程的集中控制、优化调度,确保工程安全、高效运行,为大型水利枢纽工程自动控制系统改造提供参考和借鉴。 Automatic monitor and control about large pumping station and water gate have been carried out universally. Centralized monitor center has been used too. But the remote centralized control, dispatch and monitor for large water conservancy projects need to be explored still. Based on the existing automation system ofjiangdu water conservancy project, a number of discussions are performed to improve performance of centralized control system, including construction scheme, functional requirement, and management measures. A reliable and advanced centralized control system has been built. The approach has achieved significant results to realize the centralized control and optimal scheduling to ensure the safety and economic performance in a plurality of water conservancy project. It provides useful reference for the improvement of automation system in large water conservancy project.
出处 《水利信息化》 2014年第2期50-54,共5页 Water Resources Informatization
关键词 水利枢纽 自动化控制 集中控制 研究 water conservancy project automatic control centralized control research
  • 相关文献

参考文献6

二级参考文献22

共引文献23

同被引文献42

引证文献8

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部