质量管理是调驱工艺工程管理的重要组成部分,结合茨榆坨采油厂大剂量调驱的实际情况,对调驱施工质量管理中存在的问题进行了深入分析,提出从加强人员教育培训、改变施工模式和强化施工监管3个方面提高工程质量管理水平,以实现对施工现场的过程管理控制和全面质量管理。
Quality management is an important part of flooding process field management. Combined with the actual situation of the Ciyutuo Oil Production Plant of large dose of flooding, analyzed the practical problems that exists in flooding process quality management deeply. And then strengthen 3 aspects to improve project quality management level, such as the staff education and training, changing the construction mode and strengthen supervision. So as to realize the process management and control of construction site and total quality management.
出处
《广东化工》
CAS
2014年第7期124-124,131,共2页
Guangdong Chemical Industry
关键词
质量管理
大剂量调驱
施工现场
quality management: large dose offlooding: construction site