摘要
本文详细介绍了响水涧抽水蓄能电站水泵水轮机结构设计的关键点及创新点,并对安装和调试运行中出现的典型问题做了介绍和分析,对后续400MW级蓄能机组的开发有一定的借鉴意义。
the article details the key points and innovative points of Xiangshuijian Pump-Turbine structure design, also provides the details and analysis of typical problems during installation and commissioning test, the all will have some reference and vital significance for development of 400MW Pump-Turbine.
出处
《大电机技术》
北大核心
2014年第2期67-73,共7页
Large Electric Machine and Hydraulic Turbine
关键词
响水涧蓄能电站
水泵水轮机
设计
结构
xiangshuijian pumps storage power station
pump-turbine
design
structure