摘要
十里增压泵站通过对水泵机组、电气控制、出水蝶阀等进行技术改造,运行两年以来,供水水压实现恒压控制,电耗降低明显,投资预期得到实现,其他各项经济技术指标均达到预期的效果。
Shili booster pumping station is upgraded by changing the pump unit, electrical control, and water butterfly valve, etc.. After running for two years, water pressure achieves constant-pressure controlling, which has significantly reduced the power consumption. The investment is expected to be realized, and other economic and technical indicators have reached the desired effects.
出处
《科技广场》
2014年第2期88-90,共3页
Science Mosaic
关键词
泵站
改造
机组
电耗
Pumping Station
Upgrade
Equipment
Power Consumption