钢管柱外包环梁预拼装整体吊装技术 被引量:1

The Pre-assembly and Integral Hoisting Technology for Steel-tube Column with Outer Ring Beam
下载PDF
导出
摘要 华创国际广场工程1号塔楼地下室钢管柱通过外包环梁结构与钢筋混凝土结构连接固定,环梁钢筋加工及绑扎难度大,且工程体量大、工期紧、质量要求高。针对具体情况,工程采用新型环梁预拼装整体吊装技术,论述了环梁从施工前的深化设计到使用阶段的相应原理,重点介绍了施工过程中一些注意事项和处理问题的经验方法。实践表明,应用该新型技术,能够保证环梁成型质量,满足工期要求。 The steel-tube column in the basement of the No. 1 tower building in Huachuang International Plaza project is connected and fixed with RC structure by wrapping ring beam structure. The reinforcement fabrication and banding of the ring beam is very difficult. The project amount is large, the construction period is tight and the quality requirement is high. Based on the practical condition, a new ring beam pre-assembly and integral hoisting technology is adopted. This paper discusses principle of the ring beam from detailed design to working stage, importantly introduces some attentions during construction and some experience method during problem treatment. The practice shows that the new technology can meet forming quality of the ring beam and construction period requirement.
出处 《施工技术》 CAS 北大核心 2014年第8期31-33,40,共4页 Construction Technology
关键词 钢结构 钢管柱 环梁 预拼装 整体吊装 钢筋 steel structures steel-tube column ring beam pre-assembly integralhoisting reinforcement
  • 相关文献

参考文献6

二级参考文献22

共引文献463

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部