摘要
通过工程实例,阐述了先拱后梁系杆拱桥吊装横梁施工工艺。对其吊装工艺确定、施工流程、操作要点以及取得的效益进行了详细阐述。实践证明,该吊装工艺突破了系杆拱桥传统的吊装方法,为系杆拱桥在横梁吊装施工提供了一个安全可靠、工期短,造价低的先进方法。
The cross girder hoisting construction process of first-arch second- girder tied-arch bridge was described through a project example. The hoisting process determination, construction process, operation points and obtained benefits were de- scribed in detail. The practice proves that, the hoisting process breaks through the tra- ditional hoisting method of tied-arch bridge, providing an advanced method for cross girder hoisting construction of tied-arch bridge with safety, reliability, short construc- tion period and low cost.
出处
《工程建设》
2014年第2期23-26,30,共5页
Engineering Construction
关键词
湖州外庄大桥
系杆拱桥
吊装
预制横梁
施工技术
Huzhou Waizhuang bridge
tied-arch bridge
hoisting
precast crossgirder
construction technology