摘要
介绍了美国萨金伦迪公司汽轮发电机基础设计不同于国内的设计方法 。
The design methods of Sargent & Lundy Corp. that are different from domestic experiences at the aspect of turbine-generator foundation design are described in this paper.
出处
《西北电力技术》
2000年第6期31-33,37,共4页
Northwest China Electric Power
关键词
汽轮发电机
发电
基础设计
地震荷载
施工
turbine-generator foundation allowable displacement load structure Key words Ankang power system power supply reliability study