摘要
以太原选煤厂卸车系统改造翻车机房为例,介绍了总体施工思路,对工程测量、模板工程、混凝土施工逆作法接缝处理施工技术及关键部位质量控制要点进行了研究,并提出了施工安全措施,指出使用该工法取得了良好的经济效益。
Taking the reconstruction of the dumper shed of the unload system at Taiyuan Coal Preparation Plant as the example, the paper introduces the general construction idea, researches the construction technique for the joint treatment of the reverse method, the engineering measure- ment, and the model project, points out the construction safety measures, and indicates the method achieves better economic benefits.