摘要
结合某拟建海底隧道,重点对盾构法与沉管法的特点及适应性进行了研究,并对两种方案进行了详细的对比分析,分析得出的结论可为类似工程的建设提供借鉴和参考。
Combining with a proposed submarine tunnel, this paper emphatically researched the characteristics and adaptability of shield method and immersed tube method, and made detailed contrast analysis on two kinds of schemes. The analysis conclusion could provide reference for similar engineering.
出处
《山西建筑》
2014年第14期228-229,共2页
Shanxi Architecture
关键词
海底隧道
盾构法
沉管法
施工
submarine tunnel, shield method, immersed tube method, construction